The air barrier is cheap to install and expensive to fix. Once the siding is on, a missed lap or an open penetration is buried. We roll every lap, detail every penetration and photograph the wall before anything covers it.
Rigid board goes on tight and fastened to the schedule in your spec, with furring over it when the cladding needs a drainage cavity.
What's in our scope
- Self-adhered water-resistive air barrier membranes
- Mechanically fastened house wrap with taped seams
- Continuous rigid insulation
- Window and door rough openings wrapped and sealed
- Penetrations, transitions and inside corners detailed
- PT furring strips over the insulation
What we check before it gets covered
- Laps run shingle style, top over bottom
- Every seam taped or rolled
- Penetrations sealed with the manufacturer's accessories
- Board joints tight and staggered
- Photos of each elevation sent to your super
What we need to bid
Drawings, specs, the product submittals if you have them, your schedule and the bid due date. You get unit pricing back, line by line.